Professional ceramic sanitary ware manufacturers.

English

What problem should note that bath decorates

by:Meizhi      2020-12-29
Decorating what problem should note that defend bath sanitary ware published in: 2012 - 01 - 18 [ China building materials network 】 In general, when new home delivery, toilet waterproofing work had been done, but consumers tend to decorate toilet, such as tile, ground leveling, replacement of sanitary ware, etc. , that could damage the waterproof, so suggest when decorate whether did not keep a destruction of the waterproof layer should be waterproof, waterproof and must be done thoroughly, such as wall and ground pipe joints and fluctuation between ground seams, is the most easy to leak, be sure to handle these fringes. Metope waterproof also cannot careless, because toilet for the shower room of the same function, when a lot of water splashing into the wall, if not waterproof, metope can lead to the side of the wall permeability, so the waterproof layer should begin from the ground up to brush up 10 to 20 centimeters of polyurethane waterproof coating, and then ground redo polyurethane waterproof, in order to enhance water proofing property. In order to convenient maintenance, many toilet pipes are arranged inside the ceiling, so roof moisture is very important. Do roof waterproof toilet, had better be in ceiling to daub a layer of water glass, and then use the PVC gusset plate with better waterproof properties. Toilet often have water, walk on it is very easy to slip, in order to guarantee the safety of toilet, should choose a dedicated or sauna bathroom floor tile floor, these products are waterproof, and in the case of touch water, also too won't slippery, relatively safe a lot. 1. Try not to destroy original waterproof layer, because the new house at the time of delivery is generally do the waterproof layer. 2. Heavy paving brick to do ground waterproof, besmear repeatedly with polyurethane waterproof coating 2 to 3 times. 3. Between the wall and ground pipe ground seams between joints and fluctuation, waterproof coating must be in place. 4. For decorating the up and down to toilet pipes are well cement mulch. 5. General waterproof processing with the metope of shower location adjacent to do 30 centimeters high waterproof processing. 6. Construction process in the pipes, floor drain through the floor, around the hole of the waterproof layer construction must carefully. 7. Sealed in a waterproof project done, the door and drains, with 24 hours' water test 'acceptance and waterproof. ( - - Finish the full - - ]
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...